PROJECTS

Augering for anchors
Augering for anchors

Rebar Installation
Rebar Installation

Aerial view of Construction
Aerial view of Construction

Augering for anchors
Augering for anchors

SAN FERNANDO ANCHORED RETAINING WALL

Client: Alpha Engineering and Design (2012) Ltd

This Project entailed the design and construction of an Anchored Retaining Wall for the Southern Medical Clinic in San Fernando. CPML Contractors Ltd was able to develop technology to construct the Retaining Wall from the top down, therefore eliminating the need for shoring. Earth Anchors were utilized in construction.

IMG_2424.JPG
IMG_2424.JPG

IMG_2435.JPG
IMG_2435.JPG

IMG_2431.JPG
IMG_2431.JPG

IMG_2424.JPG
IMG_2424.JPG

ST CLAIR POLICE STATION POST TENSIONED FOUNDATION

Client: Moosai Development Construction (Caribbean) Ltd

This Project entailed the design and construction of a 941 square metre Foundation using Post Tensioning Technology. It was completed successfully in December 2018.

Learn More
PHOTO-2020-03-16-07-59-41.jpg
PHOTO-2020-03-16-07-59-41.jpg

PHOTO-2020-03-11-18-23-00.jpg
PHOTO-2020-03-11-18-23-00.jpg

PHOTO-2020-03-29-09-42-12.jpg
PHOTO-2020-03-29-09-42-12.jpg

PHOTO-2020-03-16-07-59-41.jpg
PHOTO-2020-03-16-07-59-41.jpg

POWERGEN POINT LISAS WAREHOUSE

Client: Amcoweld Engineering Services Limited

This project entailed the design and construction of a 2000 square metre Post Tensioned Foundation at the Powergen Warehouse site in Point Lisas.

The use of Post Tensioning Technology was able to utilize a raft foundation instead of piles which would have been very costly to the client. 

The project was completed in March, 2020 and CPML Contractors Ltd was awarded further works at this site. 

Learn More